Weldall Manufacturing Expansion

Weldall Manufacturing Expansion To support Weldall Manufacturing, Inc. in executing its long-term growth strategy and reinforcing its commitment to expanding both operational capacity and workforce development, GRAEF is providing surveying, architecture, and engineering services for a 52,300-square-foot addition to the company’s headquarters in Waukesha, Wisconsin. This expansion features a heavy crane bay building, built to accommodate…

Read More

Quad Graphics

Quad Graphics Since 1982, GRAEF has provided ongoing engineering services for Quad, one of the largest printers of magazines, catalogs, books, and commercial materials in North America. The company is headquartered in a 1.5 million-square-foot facility in Sussex, WI, where GRAEF has provided civil, structural, and MEP engineering services along with architectural design for several…

Read More

Milwaukee Tool Research and Development Facility

Milwaukee Tool Research and Development Facility Milwaukee Tool, founded in 1924, is renowned for its power tools for the construction industry. In 2017, the company renovated its corporate headquarters in Brookfield, WI. The subsequent need for additional operational space led to the development of Project Red Speed, a three-story, 114,500 square-foot building dedicated to research…

Read More

The Eastern Apartments

The Eastern Apartments The Eastern Apartments (formerly the Standard Madison) is a 449,793-square-foot building that features 289 residential units within three wings of apartments and four connected townhomes. The luxury, mixed-use building is located on the East Washington Avenue corridor. There are two levels of underground tenant and public parking for easy accessibility. The unique…

Read More

Milwaukee Tool Re-Adaptive Reuse

Milwaukee Tool Re-Adaptive Reuse Milwaukee Tool, founded in 1924, makes power tools for the construction industry. As they continue to grow and adapt to the 21st century marketplace, Milwaukee Tool acquired and renovated the existing Blue Cross Blue Shield building in downtown Milwaukee. The existing structure featured 5 stories and a basement. This project is…

Read More

Milwaukee Athletic Club

Milwaukee Athletic Club The Milwaukee Athletic Club has been gracing the streets of Milwaukee since 1918. In 2020, it was deemed time to renovate the historic structure and update the luxury club experience for its members and visitors. The 14-story, 200,000-square-foot building included fitness, residential, and social gathering spaces. Because of the club’s age, historic…

Read More

Coca-Cola Refreshments Bottling Line Expansion

Coca-Cola Refreshments Bottling Line Expansion Coca-Cola Refreshments’ Tampa facility replaced two existing Carbonated Soft Drink (CSD) lines with two new Blow Fill CSD lines. GRAEF was part of a design-build team that designed facility modifications and system enhancements to accommodate the new blow fill lines. GRAEF is provided industrial architecture services and structural, mechanical, electrical,…

Read More

Marquette University The Commons Residence Hall

Coca-Cola Refreshments Bottling Line Expansion Coca-Cola Refreshments’ Tampa facility replaced two existing Carbonated Soft Drink (CSD) lines with two new Blow Fill CSD lines. GRAEF was part of a design-build team that designed facility modifications and system enhancements to accommodate the new blow fill lines. GRAEF is provided industrial architecture services and structural, mechanical, electrical,…

Read More

Milwaukee Tool Corporate Headquarters

Coca-Cola Refreshments Bottling Line Expansion Coca-Cola Refreshments’ Tampa facility replaced two existing Carbonated Soft Drink (CSD) lines with two new Blow Fill CSD lines. GRAEF was part of a design-build team that designed facility modifications and system enhancements to accommodate the new blow fill lines. GRAEF is provided industrial architecture services and structural, mechanical, electrical,…

Read More

Laacke & Joys Redevelopment, Bader Rutter Corporate Office

Coca-Cola Refreshments Bottling Line Expansion Coca-Cola Refreshments’ Tampa facility replaced two existing Carbonated Soft Drink (CSD) lines with two new Blow Fill CSD lines. GRAEF was part of a design-build team that designed facility modifications and system enhancements to accommodate the new blow fill lines. GRAEF is provided industrial architecture services and structural, mechanical, electrical,…

Read More