Skip to content

Transportation Engineering

Andre Ost

Practice Area Leader – Transportation Design

Read More

US Highway 18 (Bluemound Road)

US Highway 18 (Bluemound Road) GRAEF was selected by WisDOT to conduct the planning effort for the US 18 resurfacing project. The team recommended corridor improvements after analyzing safety, operations, and geometric deficiencies along the existing roadway. Seven miles of US 18 will be resurfaced from Manhattan Drive in the City of Waukesha to 124th…

Read More

Dane County Regional Airport

Dane County Regional Airport First and last impressions are arguably the most important of an airport experience. Dane County Regional wanted to ensure that upon entering, parking, picking up a rental car, and exiting, consumers felt welcomed and at ease. GRAEF used BIM technology and sustainable design for a 1,224-car expansion to an existing parking…

Read More

71st Street Streetscape Improvements

71st Street Streetscape Improvements The 71st Street Master Plan Study analyzed existing conditions of the corridor with the objective of providing a detailed master plan for its redevelopment. The master plan looked at the entire project corridor as it relates to adjacent neighborhoods and the overall context of South Chicago. Located within Chicago’s historic South…

Read More