Mechanical, Electrical, Plumbing Engineering
Milwaukee Bucks 5th Street Parking Structure
Milwaukee Bucks 5th Street Parking Structure GRAEF led the design team for the Milwaukee Bucks 1,300-stall parking structure that is part of the new downtown arena district. GRAEF professionals provided structural, mechanical, electrical and plumbing engineering, landscape architecture, and project management for this multi-discipline project, in addition to leading the rest of the team, including…
Read MoreLawrence University Warch Campus Center
Lawrence University Warch Campus Center Lawrence University completed a four-story, 107,000-square-foot campus center, the largest building project in the university’s 162-year history. The center features a 134-seat cinema, cafe, convenience store, student post office, and student dining. The $35 million center is built along the significantly sloped and wooded north bluff of the Fox River. GRAEF…
Read MoreLakefront Gateway Plaza
Lakefront Gateway Plaza The GRAEF team was recently awarded the design of the Downtown Lakefront Gateway Plaza after a national design competition in which 24 firms vied for the opportunity to design a signature public plaza at the Milwaukee lakefront. There are three central themes that underpin the GRAEF team’s design. Reconnect. Reconnection of Milwaukee’s urban…
Read MoreLake Eva Park
Lake Eva Park Lake Eva Park in Haines City, Florida is an expansion and renovation of existing buildings as well as several new building structures. The 28-acre site was completed in July 2009, in time for the local 4th of July celebration. The site includes a new, 9,000-square-foot maintenance building; a new building with an…
Read MoreHaines City Medical Office Building
Haines City Medical Office Building GRAEF provided structural engineering services for a new 45,000-square-foot, three-story medical office building in Haines City, Florida for Summit Smith Healthcare Facilities in conjunction with Proteus Group. The building elements were designed to withstand 110 miles-per-hour, hurricane-force winds required by the Florida Building Code. The medical office is a braced…
Read MoreKaukauna Hydro Park
Kaukauna Hydro Park For over a decade, Kaukauna Utilities (KU) collaborated with the Federal Energy Regulatory Commission (FERC) to secure a new license for upgrading the Badger Hydro Plant in downtown Kaukauna. This project included constructing a new powerhouse and modifying the power canal, located within the historic Badger Hydro-Electric District, which has been on…
Read MoreHart Park Athletic Fields
Hart Park Athletic Fields The City of Wauwatosa wanted to restore this community asset back to the regional athletic venue it once was. Hart Park’s usage had steadily declined due to age and declining quality of the grass football field, running track and stadium. GRAEF prepared a detailed report of different alternatives for renovations including a…
Read MoreGE Healthcare Guardhouse
GE Healthcare Guardhouse The entrance to GE Healthcare’s West Milwaukee campus was in need of replacement and upgrades. This was due to Department of Homeland Security requirements, aging infrastructure that was failing, a less than optimal configuration, inadequate capacity to accommodate traffic, and sub-standard facilities for site security. The design of the new guardhouse and…
Read MoreFranklin Sewer & Water Building
Franklin Sewer & Water Building GRAEF provided the City with architectural/engineering services related to design and construction of a new facility for the Franklin Sewer and Water Utility. GRAEF provided project management services, civil engineering; landscape architectural design; architectural design; structural engineering; mechanical, electrical, and plumbing engineering; fire protection design; and construction administration to remodel the…
Read MoreFort Lauderdale-Hollywood International Airport Terminal 3 Modernization
Fort Lauderdale-Hollywood International Airport Terminal 3 Modernization GRAEF provided structural, mechanical, plumbing, fire protection, and civil engineering services as part of a design-build team for the modernization of Terminal 3 for JetBlue Airways at Fort Lauderdale-Hollywood International Airport. The modernization included the relocation of Gate F1 for JetBlue. The scope of work entailed utility, apron…
Read More