Markets
Covered Bridge Road Bridge Reconstruction
Covered Bridge Road Reconstruction Covered Bridge Road Bridge, running north-south over Cedar Creek on Covered Bridge Road next to the historic Covered Bridge in the Town of Cedarburg, was rated structurally deficient with a sufficiency rating of 43.3 and an NBI rating of 4 for the deck, structural evaluation, and superstructure. The bridge had numerous…
Read MoreSouth Milwaukee High School Field Redevelopment
South Milwaukee High School Field Redevelopment South Milwaukee High School made upgrades to revitalize its athletic fields, igniting excitement among the district and community. Due to inadequate drainage, suboptimal soil conditions, and the cumulative impact of regular use over the years, renovation efforts were completed on the natural grass fields dedicated to football, baseball, and…
Read MoreUnderwood Elementary
Underwood Elementary School The Wauwatosa School District constructed a new school facility at the Underwood Elementary School site. Development activities included construction of a new school building, sidewalk, playground areas, access drives, parking areas, landscaping, and utilities. Green infrastructure improvements were incorporated into the site design and included the following items: porous asphalt pavement with…
Read MoreWilson Elementary
Wilson Elementary School Native plants and stormwater management were key focal points in designing green infrastructure upgrades for Wilson Elementary School. Wilson Elementary was one of six schools within the Wauwatosa School District for which GRAEF completed green infrastructure improvements using MMSD GIPP funds. Integrated within the site design were several native-planted bio basins, a…
Read MoreMilwaukee Tool Re-Adaptive Reuse
Milwaukee Tool Re-Adaptive Reuse Milwaukee Tool, founded in 1924, makes power tools for the construction industry. As they continue to grow and adapt to the 21st century marketplace, Milwaukee Tool acquired and renovated the existing Blue Cross Blue Shield building in downtown Milwaukee. The existing structure featured 5 stories and a basement. This project is…
Read MoreCarl Sandburg High School Baseball Field
Carl Sandburg High School Baseball Field Tasked with developing the reconstruction plans for the varsity baseball field at a high school, the GRAEF design team went to work! The new field is surfaced with artificial turf and an underlying drainage layer to convey storm water flows, making it easier to take the field after adverse…
Read MoreHistoric Third Ward Riverwalk
Historic Third Ward Riverwalk The Third Ward section of Milwaukee’s Riverwalk promotes greater pedestrian access to downtown as well as provides artistry to the junction of built and natural environments. In 2005, Milwaukee’s Historic Third Ward celebrated the opening of the riverwalk, stretching along the Milwaukee River for three-quarters of a mile. GRAEF was selected…
Read MoreDoor County Medical Center
Door County Medical Center The Door County Medical Center (DCMC) is a $15 million, 30,000-square-foot facility located in Sister Bay, Wisconsin. The new medical center replaces the previous Fish Creek facility, allowing all services to be located in one place. Previously, patients had to travel to the DCMC clinic in Sturgeon Bay for services such…
Read MorePublix at Sunny Isles Beach
Publix at Sunny Isles Beach Publix at Sunny Isles Beach is nestled between the Atlantic Ocean and Dumfounding Bay. The $30 million dollar supermarket sits on a 3.5-acre parcel and offers first level shopping and two levels of garage parking above. GRAEF served as the civil engineer of record on the brand new facility, including…
Read MoreUrban Ecology Ephemeral Pond
Urban Ecology Ephemeral Pond The Urban Ecology Center wanted to create a learning experience for school-age and adult visitors to show the intricacies of a wetland micro-environment. The ephemeral pond is intended to be a wet pond with a maximum depth of about two feet, tapering down to zero, to provide habitat for frogs and…
Read More