GRAEF was responsible for the data collection, planning, design and permitting, final engineering and construction drawings and technical and environmental specifications for two vertical seawalls to stabilize 3,000 ft of coastal roadway, roadway associated drainage, safety railings and road resurfacing and remediation located on the Gulf of Mexico.

The shorelines at both sites are critically eroded, and a 5-year event is likely to cause failure of the hurricane evacuation route providing access to Casey Key. The wall elevations were designed based on existing topography and road elevations to minimize impacts on adjacent residences. The wall alignment was developed in coordination with regulatory agencies, the County and residents to identify an alignment that balances permit requirements, the sea turtle nesting habitat, community values, and minimizes impacts on local coastal processes.
A sub-surface drainage system was designed for both sites including the effects of wave and tidal conditions that affect the subgrade conditions and stability of the roadway.

At the north site, the existing roadway sub-base has significant voids, which required a remediation and road resurfacing design.

Key Project Elements Included:

  • Flood Damage Reduction
  • Coastal Systems
  • Hard Coastal/Shoreline Protection Structures
  • Stormwater and Drainage Design
  • Data Collection & Mapping
  • Local, State and Federal Permitting
  • Numerical Modeling & Analysis
  • Public Involvement
  • Resilience

Other Projects

MN ZOO DINO EXHIBIT_GRAEF

Minnesota Zoo Dino Hideout

Harley-Davidson Museum_GRAEF

Harley-Davidson Museum

MSOE Viets Field

MSOE Viets Field

MSOE Viets Tower

MSOE Viets Tower

MSOE Diercks Hall

MSOE Diercks Hall

Landmark Credit Union

Landmark Credit Union

Location

Casey Key, Florida

 

Services

Coastal Engineering

 

Casey Key Contact

Office Leader - Sarasota, Turks and Caicos