WisDOT USH 41 Expansion Project – Winnebago WIS 21-USH 45

WisDOT USH 41 Expansion Project – Winnebago WIS 21-USH 45 This project consisted of the freeway expansion of USH 41 and bringing the roadway to Interstate Standards.  This project included the reconstruction of the WIS 21 interchange and work on USH 41 between WIS 21 and the Lake Butte des Morts causeway. https://graef-usa.com/wp-content/uploads/BRANDED_-_IH_41_Winnebago.mp4 Other Projects…

Read More

WisDOT IH 41 Resurfacing Project – Appleton to Green Bay

WisDOT IH 41 Resurfacing Project – Appleton to Green Bay This maintenance project involved extending the life of deteriorating pavement over a 12 mile stretch of the IH 41 corridor and respective interchange ramps from WIS 15 – County J in the towns of Grand Chute, Vandenbroek, Kaukauna, village of Little Chute, city of Appleton…

Read More

WisDOT County Highway JJ Manitowoc River Bridge Replacement

WisDOT County Highway JJ Manitowoc River Bridge Replacement The project consisted of the bridge replacement and approach work on CTH JJ over the Manitowoc River to improve the overall safety by addressing structural deficiencies. Construction inspection of major items of work included the demolition and removal of the existing bridge structure B-36-19, construction of the…

Read More

WisDOT Manitowoc Road Reconstruction

WisDOT Manitowoc Road Reconstruction The project consisted of a 1.4-mile urban rehabilitation project improving pavement conditions, safety, drainage and pedestrian facilities with extensive public outreach and coordination.  Construction inspection of major items of work, removing asphaltic surface, removing curb and gutter, grading, storm sewer, concrete curb and gutter, concrete sidewalk and driveway, HMA paving, pavement…

Read More

WisDOT WIS 50 Paddock Lake Construction Management        

WisDOT WIS 50 Paddock Lake Construction Management   This project consisted of a 1.7-mile full reconstruction of WIS 50 (75th Street) through the Village of Paddock Lake. The work includes 2 cast-in-place retaining walls and several block gravity walls. A new, larger storm sewer was installed along with a large storm water detention pond. The…

Read More

WisDOT I-94 Rawson Avenue Interchange Bridge & Ramps Construction Management            

WisDOT I-94 Rawson Avenue Interchange Bridge & Ramps Construction Management   This project consisted of the reconstruction of the I-94 Rawson Avenue Interchange bridge and ramps. This was the pilot project for WisDOT’s first-time use of the Self-Propelled Modular Transporter (SPMT) type of bridge construction. The spans were constructed on temporary abutments within the right…

Read More

WisDOT Milwaukee Zoo Interchange Reconstruction

WisDOT Milwaukee Zoo Interchange Reconstruction The Zoo Freeway is a major north-south facility in western Milwaukee County, running 13.5 miles from the Hale Interchange in Greenfield to the North Interchange in northwest Milwaukee. At the Hale Interchange, the I 894/US 45/Zoo Freeway meets the I 43/Rock Freeway and the I 894/I 43/Airport Freeway, while at…

Read More

IDOT I-132 Grand Avenue Construction Management

IDOT I-132 Grand Avenue Construction Management GRAEF helped to provide Phase III inspection services on this project. The primary feature was the construction of a dry-land bridge, replacing an existing structure on an IDOT roadway. Project scope included hot mix asphalt (HMA) roadway resurfacing, 3800 feet of new plain cement concrete (PCC) sidewalk including 12…

Read More

FDOT District 3 Construction Engineering and Inspection – SR 57

FDOT District 3 Construction Engineering and Inspection – SR 57 GRAEF is the prime CEI consultant for this $11.7M project on SR 57 (US 19) (North Jefferson St.) from SR 10 (US 90) (Washington St.) to the Georgia State Line in Jefferson County, Florida.  This project consists of resurfacing the travel and parking lanes, on-street…

Read More