Markets
Emerald Beach
Emerald Beach GRAEF provided coastal engineering services to restore the highly eroded shoreline at Emerald Beach and a new inlet channel constructed to provide boat access for sport and commercial fishing. GRAEF acquired all Turks & Caicos Islands regulatory permits in 2004, prepared contract documents and drawings, and managed construction bidding and contractor selection. As…
Read MoreAmbergris Cay
Ambergris Cay GRAEF designed a phased approach for the development of the Ambergris Marina. Phase 1 was designed to restore the navigability of the entrance channel and “beautify” the marina by excavating the salt flats to provide circulation as well as provide a tidal connection between the marina basin and the entrance channel to promote…
Read MoreEast Grace Bay
East Grace Bay GRAEF completed the final beach restoration plans and design for a one‐mile beach nourishment project and four T-head groins. The design was based on an alternative analysis and evaluation of sediment quality and quantities that maximized beach quality material for placement. The final design maximizes project longevity, minimizes adverse impacts to biological…
Read MoreBlue Cay
Blue Cay Coastal Design and Engineering, a GRAEF company (CDE), was selected to design, permit and manage the construction for the coastal and marine infrastructure components of a 14.5-acre waterfront development. The project included an 870-foot-long and 85-foot-wide canal, a recreational beach stabilized by coastal structures, waterfront facilities and upland grading for 16 residential properties.…
Read MoreBajacu Lagoon
Bajacu Lagoon Coastal Design and Engineering, a GRAEF company (CDE), provided coastal and marine engineering services including planning, design, engineering and environmental services to engineer a beach and lagoon system in a cove configuration, creating a recreational beach and ocean water access for a large, luxury villa on an expansive lot located in the Turks…
Read MoreRyan Cournoyer
Climate Ready Oak Park Plan
Climate Ready Oak Park Plan Community Sustainability, Climate Action & Resilience Plan Visit the Climate Ready Oak Park Plan here The Oak Park community is committed to doing their part to overcome climate change and its effect on our environment, social fabric, and economy. In 2021, along with GRAEF and ERG, they began looking at…
Read MoreMilwaukee County Zoo Adventure Africa Hippo Haven
Milwaukee County Zoo Adventure Africa Hippo Haven Hippo Haven is the second phase of a two-part development – Adventure Africa – at the Milwaukee County Zoo. The project represents the largest physical change to the award-winning zoo since it opened in 1961. Adventure Africa transforms 25% of the zoo’s footprint. Phase I included a new…
Read MoreWisDOT County Q Bridge
WisDOT County Q Bridge GRAEF was selected to provide the engineering planning and design for replacing the County Q bridge over the Oconomowoc River, involving collaboration with WisDOT and Waukesha County. The existing bridge, deemed structurally deficient, was rebuilt under the Local Bridge Program. Various design options were considered to meet navigational and construction requirements…
Read MoreLongfellow Middle School Softball Fields
Longfellow Middle School Softball Fields Wauwatosa East High School’s softball team now hosts their opponents a the artificial turf field at Longfellow Middle School. Wauwautosa School District’s newest field at Longfellow Middle School is the new home diamond of the Tosa East High School softball team. The $1.8 million field renovation includes an artificial turf…
Read More