Milwaukee Climate and Equity Plan

Milwaukee Climate and Equity Plan Visit the Milwaukee Climate and Equity Plan Here GRAEF served as the prime consultant to the City of Milwaukee’s Environmental Collaboration Office (ECO) for the creation of the City’s first Climate & Equity Plan (CEP). The City led the initial phase of community engagement and data gathering but lacked the…

Read More

Margaritaville Hollywood Beach Resort

Margaritaville Hollywood Beach Resort GRAEF provided engineering services for the Margaritaville Hollywood Beach Resort, which was constructed along both sides of North Ocean Boulevard (State Road A1A) between the Intracoastal Waterway and the Atlantic Ocean adjacent to the Hollywood Beachwalk. The project included a 200-room full-service hotel with extensive resort activities that included a massive…

Read More

WisDOT Grantosa Drive Bridge Rehabilitation

WisDOT Grantosa Drive Bridge Rehabilitation The project included two bridges on West Grantosa Drive spanning WIS 145. Constructed in 1965, these 4-span steel girder bridges were in need of rehabilitation to maintain the existing facility life. This project also included designs for thin polymer overlays and load ratings on 8 bridges. These included STH 145…

Read More

Carle at the Riverfront

Carle at the Riverfront Carle Health provides highly accessible, high-quality care and service to improve health in communities throughout central Illinois and beyond. As the years progressed, the organization noticed a rise in patient needs and an expansion in services offered. Carle acknowledged the constraints of its space with a growing population and decided to…

Read More

Underwood Elementary

Underwood Elementary School The Wauwatosa School District constructed a new school facility at the Underwood Elementary School site. Development activities included construction of a new school building, sidewalk, playground areas, access drives, parking areas, landscaping, and utilities. Green infrastructure improvements were incorporated into the site design and included the following items: porous asphalt pavement with…

Read More

Wilson Elementary

Wilson Elementary School Native plants and stormwater management were key focal points in designing green infrastructure upgrades for Wilson Elementary School. Wilson Elementary was one of six schools within the Wauwatosa School District for which GRAEF completed green infrastructure improvements using MMSD GIPP funds. Integrated within the site design were several native-planted bio basins, a…

Read More

St. Augustine Preparatory School

St. Augustine Prep St. Augustine Preparatory Academy is a new non-denominational Christian school located on an 11-acre campus located on Milwaukee’s South Side. This new $85 million, 160,000-square-foot school serves 4K-12 students in a student-centered environment where grade levels are grouped together to form individual learning neighborhoods. The complex offers regulation-size indoor and outdoor soccer…

Read More

Milwaukee Tool Re-Adaptive Reuse

Milwaukee Tool Re-Adaptive Reuse Milwaukee Tool, founded in 1924, makes power tools for the construction industry. As they continue to grow and adapt to the 21st century marketplace, Milwaukee Tool acquired and renovated the existing Blue Cross Blue Shield building in downtown Milwaukee. The existing structure featured 5 stories and a basement. This project is…

Read More