Ridgeland Commons

Ridgeland Commons Ridgeland Commons is the signature athletic facility for the Park District of Oak Park. The facility includes the Paul Hruby Ice Arena, an outdoor pool, and lighted baseball fields. The aging complex received a $14 million renovation and expansion which preserves its most distinguishing feature – an exposed wood structure over the ice…

Read More

Ed Smith Stadium Renovations

Ed Smith Stadium Renovations The Baltimore Orioles were remodeling! GRAEF’s team provided MEP renovations and new additions to an existing stadium that now serves as the Spring Training Facility for the Major League Baseball Baltimore Orioles. The newly renovated Ed Smith Stadium includes a party deck, sun shading and private suites along with its existing…

Read More

ProHealth Regional Cancer Center

ProHealth Regional Cancer Center GRAEF provided landscape architecture design and site/civil and traffic engineering services for this 116,000-square-foot regional cancer care center. Landscape program elements include green roofs, healing garden development, outdoor courtyards/terraces, pedestrian circulation and walkways, special paving areas, parking lot landscape and screening, site furniture, landscape lighting and site amenities. The cancer center…

Read More

ProHealth Mukwonago Emergency Room

ProHealth Mukwonago Emergency Room ProHealth added an ER to its multi-specialty outpatient center in Mukwonago. This two-story, 66,500-square-foot building houses a new emergency department, an ambulance garage, an imaging expansion and mechanical support space on the lower level. The addition includes an extensive roof garden designed by GRAEF’s landscape architects. Also included is a new…

Read More

Oshkosh YMCA Addition and Renovation

Oshkosh YMCA Addition and Renovation GRAEF provided engineering services for a major addition and renovation to the existing Oshkosh YMCA. Improvements included a new pool and locker room area, a new childcare facility with outdoor play space, along with major modifications to entries and equipment areas. Construction is currently underway at this facility, and it…

Read More

Orlando International Airport Parking Garages Lighting Retrofit

Orlando International Airport Parking Garages Lighting Retrofit GRAEF provided electrical engineering services for a lighting retrofit project for 7,000,000 square feet of parking garages including the terminal top and landscape areas between Garages A and B at Orlando International Airport. Work included on-site analysis, data collection, field verification of existing electrical distribution and emergency lighting…

Read More

Openlands Lakeshore Trail

Openlands Lakeshore Trail GRAEF provided overall design and project management, as we led a team of consultants to protect and restore this unique 1-mile segment of Lake Michigan shoreline. The restoration activities are the first step in the eventual transformation of the property into one of the largest publicly accessible lakefront preserves in Illinois. Restoration included…

Read More

Northwestern Mutual Franklin Campus

Northwestern Mutual Franklin Campus Northwestern Mutual Life Insurance Company’s 84-acre campus in Franklin, Wisconsin contains over two million square feet of office space developed in two phases. GRAEF was the structural engineer for both office buildings and parking engineer for the second structure, including the design of multiple circulation paths and entry/exit lanes. Phase 1…

Read More

Milwaukee Tool Corporate Headquarters

Milwaukee Tool Corporate Headquarters Milwaukee Tool expanded their corporate headquarters in Brookfield, WI. The new 205,000 square-foot, four-story building connects to their existing facility allowing simple access throughout the entire building. Their new headquarters features structural and architectural elements that show off Milwaukee Tool and their values including exposed columns and beams with a raw…

Read More

Milwaukee Bucks 5th Street Parking Structure

Milwaukee Bucks 5th Street Parking Structure GRAEF led the design team for the Milwaukee Bucks 1,300-stall parking structure that is part of the new downtown arena district. GRAEF professionals provided structural, mechanical, electrical and plumbing engineering, landscape architecture, and project management for this multi-discipline project, in addition to leading the rest of the team, including…

Read More