IDOT I-57

IDOT I-57 GRAEF developed Highway Plans for a 4” resurfacing of I-57 from I-294 to IL Route 1. Pavement patching, retaining wall modifications, and drainage improvements were included in the improvement. GRAEF completed two field visits and a field patching survey and reviewed prior improvement plans. GRAEF also reviewed IDOT’s Drainage Investigation Report and implemented…

Read More

CDOT Green Bay Avenue

CDOT Green Bay Avenue The project consisted of Phase II engineering services for the reconstruction of 2000 feet of Green Bay Avenue from 83rd Street to 86th Street, along with the construction of 300’ of new 84th Street roadway from Green Bay Avenue to Lake Shore Drive. A new storm sewer system was also constructed…

Read More

Chicago Park District Park 510

Chicago Park District Park 510 GRAEF was hired by the Chicago Park Department (CPD) to complete the site design for the Park 510 redesign. The design of this three-acre site included site plans, detailed grading plans, drainage plans and construction details for the artificial turf athletic field. The site was enrolled in the Site Restoration…

Read More

71st Street Streetscape Improvements

71st Street Streetscape Improvements The 71st Street Master Plan Study analyzed existing conditions of the corridor with the objective of providing a detailed master plan for its redevelopment. The master plan looked at the entire project corridor as it relates to adjacent neighborhoods and the overall context of South Chicago. Located within Chicago’s historic South…

Read More