WisDOT WIS 50 Paddock Lake Construction Management        

WisDOT WIS 50 Paddock Lake Construction Management   This project consisted of a 1.7-mile full reconstruction of WIS 50 (75th Street) through the Village of Paddock Lake.  The work includes 2 cast-in-place retaining walls and several block gravity walls.  New larger storm sewer was installed along with a large storm water detention pond.  The roadway…

Read More

WisDOT I-94 Rawson Avenue Interchange Bridge & Ramps Construction Management            

WisDOT I-94 Rawson Avenue Interchange Bridge & Ramps Construction Management   This project consisted of the reconstruction of the I-94 Rawson Avenue Interchange bridge and ramps. This was the pilot project for WisDOT’s first time use of the Self-Propelled Modular Transporter (SPMT) type of bridge construction. The spans were constructed on temporary abutments within the right…

Read More

WisDOT Milwaukee Zoo Interchange Reconstruction

WisDOT Milwaukee Zoo Interchange Reconstruction The Zoo Freeway is a major north-south facility in western Milwaukee County, running 13.5 miles from the Hale Interchange in Greenfield to the North Interchange in northwest Milwaukee. At the Hale Interchange, the I 894/US 45/Zoo Freeway meets the I 43/Rock Freeway and the I 894/I 43/Airport Freeway, while at…

Read More

River Trails School Urban Forest

River Trails School Urban Forest River Trail School of Agriculture and Science, a school within the Milwaukee Public School (MPS) system, caters to a diverse community of approximately 400 K-8 students located on the Northwest side of Milwaukee. Renowned for its commitment to fostering excellence in agricultural sciences education from kindergarten through eighth grade, River…

Read More

La Crosse 2040 Comprehensive Plan

La Crosse 2040 Comprehensive Plan View the La Crosse 2040 Comprehensive Plan Here La Crosse adopted its first Comprehensive Plan, Confluence, in 2002, and, like many communities during the early phase of comprehensive planning, designed the plan to closely reflect the requirements outlined by state statute. The result was a 500-page document robust with information…

Read More

Milwaukee Climate and Equity Plan

Milwaukee Climate and Equity Plan Visit the Milwaukee Climate and Equity Plan Here GRAEF served as the prime consultant to the City of Milwaukee’s Environmental Collaboration Office (ECO) for the creation of the City’s first Climate & Equity Plan (CEP). The City led the initial phase of community engagement and data gathering but lacked the…

Read More

Margaritaville Hollywood Beach Resort

Margaritaville Hollywood Beach Resort GRAEF provided engineering services for the Margaritaville Hollywood Beach Resort, which was constructed along both sides of North Ocean Boulevard (State Road A1A) between the Intracoastal Waterway and the Atlantic Ocean adjacent to the Hollywood Beachwalk. The project included a 200-room full-service hotel with extensive resort activities that included a massive…

Read More

WisDOT Grantosa Drive Bridge Rehabilitation

WisDOT Grantosa Drive Bridge Rehabilitation The project included two bridges on West Grantosa Drive spanning WIS 145. Constructed in 1965, these 4-span steel girder bridges were in need of rehabilitation to maintain the existing facility life. This project also included designs for thin polymer overlays and load ratings on 8 bridges. These included STH 145…

Read More

Carle at the Riverfront

Carle at the Riverfront Carle Health provides highly accessible, high-quality care and service to improve health in communities throughout central Illinois and beyond. As the years progressed, the organization noticed a rise in patient needs and an expansion in services offered. Carle acknowledged the constraints of its space with a growing population and decided to…

Read More