Loop the Lake Boardwalk Bridges

Loop the Lake Boardwalk Bridges GRAEF completed the full detailed design, bidding, and construction management of two separate boardwalk bridges. One bridge is located in the City of Neenah spanning the Neenah channel. This bridge is 768 feet long with twelve 64-foot spans. The second bridge is located in the City of Menasha spanning the…

Read More

Hoan Bridge Inspection and Reconstruction

Hoan Bridge Inspection and Reconstruction GRAEF conducted an in-depth inspection of the Hoan Bridge over the Milwaukee River. Wisconsin-certified bridge inspectors examined the three-span tied arch and the girder and floor beam system from the Lakefront Interchange to Carferry Drive; completed detailed reports that documented all changing conditions since the 1999 inspection; identified new deficiencies;…

Read More