East Capitol Drive Reconstruction

East Capitol Drive Reconstruction Interesting neighborhoods, intriguing people, wonderful architecture, eclectic shops and restaurants, exceptional schools, access to Lake Michigan—all are attributes of the Village of Shorewood. As one of only two primary arterials running through the one-mile square Village, the East Capitol Drive (STH 190) reconstruction represented a community’s desire to create a corridor…

Read More

IDOT I-90 Hot Tap

IDOT I-90 Hot Tap TDW Services retained GRAEF to provide Resident Engineer and quality control services for the hot tapping of a 30-year-old, 90-inch water main owned and operated by the Northwest Suburban Municipal Joint Action Water Agency on behalf of the Illinois Tollway. This project allowed for the widening of I-90 through the western…

Read More

Bridges Over USH 41 and USH 45, Washington County

Bridges Over USH 41 and USH 45, Washington County Construction inspection was completed for 0.8 miles of STH 145 with five roundabouts, and the deck replacement and widening of two bridges over USH 41 and 45. Major items of work included grading, curb and gutter, concrete paving, storm sewer, lighting, marking and signing. Other Projects…

Read More

71st Street Streetscape Improvements

71st Street Streetscape Improvements The 71st Street Master Plan Study analyzed existing conditions of the corridor with the objective of providing a detailed master plan for its redevelopment. The master plan looked at the entire project corridor as it relates to adjacent neighborhoods and the overall context of South Chicago. Located within Chicago’s historic South…

Read More