West North Avenue

West North Avenue The City of Wauwatosa is reconstructing a segment of North Avenue as part of a three-party contract with the Wisconsin Department of Transportation (WisDOT). The project segment is approximately 0.9 miles, running from Mayfair Road (STH 100) to N 95th Street. The section from Mayfair Road (STH 100) to west of the…

Read More

West Walnut Street

West Walnut Street GRAEF performed design services for the reconstruction of W. Walnut in the City of Milwaukee as part of WisDOT’s Local Road program. The fully developed 4-lane divided thoroughfare was surveyed to obtain detailed topographic features within the project limits. The proposed improvements included reducing the roadway to a 2-lane divided section with…

Read More

County O Moorland Road

County O Moorland Road This segment of CTH O is a vital commuter link to the I-94 corridor as well as the local businesses and municipalities. The existing concrete pavement within this section of roadway has deteriorated to a point that now requires pavement replacement. The area is continuously being developed and redeveloped to the…

Read More

West National Avenue

National Avenue West Allis WI

West National Avenue Reconstruction To draw attention to the heart of West Allis, the city worked with GRAEF to develop a roadmap to enhance the National Avenue corridor – the main street of West Allis. The roadmap included everything from roadway improvements to streetscaping plans. The complete reconstruction of the roadway and sidewalks is highly…

Read More

WisDOT US Highway 18 (Bluemound Road)

WisDOT US Highway 18 (Bluemound Road) GRAEF was selected by WisDOT to conduct the planning effort for the US 18 resurfacing project. The team recommended corridor improvements after analyzing safety, operations, and geometric deficiencies along the existing roadway. Seven miles of US 18 will be resurfaced from Manhattan Drive in the City of Waukesha to…

Read More

Hoan Bridge Reconstruction Project

Hoan Bridge Reconstruction Project GRAEF was selected by WisDOT to provide engineering design services for this complex freeway rehabilitation project. Key elements of the project included redecking of the 2 mile long Hoan Bridge along with rehabilitation details for the steel girders. Additional work included placement of a concrete overlay on the 29 units that comprise…

Read More

East Capitol Drive Reconstruction

East Capitol Drive Reconstruction Interesting neighborhoods, intriguing people, wonderful architecture, eclectic shops and restaurants, exceptional schools, access to Lake Michigan—all are attributes of the Village of Shorewood. As one of only two primary arterials running through the one-mile square Village, the East Capitol Drive (STH 190) reconstruction represented a community’s desire to create a corridor…

Read More