CDOT Green Bay Avenue

CDOT Green Bay Avenue The project consisted of Phase II engineering services for the reconstruction of 2000 feet of Green Bay Avenue from 83rd Street to 86th Street, along with the construction of 300’ of new 84th Street roadway from Green Bay Avenue to Lake Shore Drive. A new storm sewer system was also constructed…

Read More

IDOT I-90 Westbound

IDOT I-90 Westbound GRAEF and its subconsultant team completed a single span bridge design over Higgins Creek as well as the Westbound Collector Distributor (CD) Roadway design from northbound I-490 to WB I-90 in 2018. The bridge and Westbound CD Roadway were let in separate contracts, which were each part of the Tollway’s objective of…

Read More

Historic Third Ward Riverwalk

Historic Third Ward Riverwalk The Third Ward section of Milwaukee’s Riverwalk promotes greater pedestrians access to downtown as well as provides artistry to the junction of built and natural environments. In 2005 Milwaukee’s Historic Third Ward celebrated the opening of the riverwalk, stretching along the Milwaukee River for three-quarters of a mile. GRAEF was selected…

Read More

Door County Medical Center

Door County Medical Center The Door County Medical Center (DCMC) is a $15 million, 30,000-square-foot facility located in Sister Bay, Wisconsin. The new medical center replaces the previous Fish Creek facility, allowing all services to be located in one place. Previously, patients had to travel to the DCMC clinic in Sturgeon Bay for services such…

Read More

Publix at Sunny Isles Beach

Publix at Sunny Isles Beach Publix at Sunny Isles Beach is nestled between the Atlantic Ocean and Dumfounding Bay. The $30 million dollar supermarket sits on a 3.5-acre parcel and offers first level shopping and two levels of garage parking above. GRAEF served as the civil engineer of record on the brand new facility, including…

Read More

Urban Ecology Ephemeral Pond

Urban Ecology Ephemeral Pond The Urban Ecology Center wanted to create a learning experience for school-age and adult visitors to show the intricacies of a wetland micro-environment. The ephemeral pond is intended to be a wet pond with a maximum depth of about two feet, tapering down to zero, to provide habitat for frogs and…

Read More

IDOT I-132 Grand Avenue Construction Management

IDOT I-132 Grand Avenue Construction Management GRAEF helped to provide Phase III inspection services on this project. The primary feature was the construction of a dry-land bridge, replacing an existing structure on an IDOT roadway. Project scope included HMA roadway resurfacing, 3800 feet of new PCC sidewalk including 12 ADA-compliant ramps, roadway widening from 2…

Read More

FDOT District 3 Construction Engineering and Inspection – SR 57

FDOT District 3 Construction Engineering and Inspection – SR 57 GRAEF is the prime CEI consultant for this $11.7M project on SR 57 (US 19) (North Jefferson St.) from SR 10 (US 90) (Washington St.) to the Georgia State Line in Jefferson County, Florida.  This project consists of resurfacing the travel and parking lanes, on…

Read More

Kinnickinnic River – Pulaski Park

Kinnickinnic River – Pulaski Park The Kinnickinnic River, Reach 2 Pulaski Park project created a revitalized community asset while improving drainage and enhancing neighborhood safety. The MMSD took the initiative to revisit outdated solutions for flood mitigation, still a serious issue, and achieved their goal of an improved watercourse that more safely handles flows during…

Read More

333 Water

333 Water 333 N. Water Street will be a 31-story luxury residential high-rise, the first located in Milwaukee’s Historic Third Ward neighborhood. The building is expected to create 333 new luxury rental units alongside over 22,000 feet of indoor and outdoor amenities. The units will be finished with floor-to-ceiling windows, quartz counters, a fitness center,…

Read More