West Ridge Elementary School

West Ridge Elementary School GRAEF completed site/civil and structural engineering design for the new, 120,000-square-foot West Ridge Elementary School on a three-acre site. The building is three stories with steel frame and masonry construction. Site improvements include a new parking lot, access drives, permeable fire lane, and outdoor plaza, in addition to new utilities and…

Read More

Latin School of Chicago

Latin School of Chicago GRAEF provided structural design when the Latin School of Chicago underwent a significant renovation. Lower School The Lower School, originally built in 1926, acquired 18,000 square feet of additional space and 14,000 square feet of renovated space. The renovation included updated classrooms, new offices, an expanded library and art facilities, and…

Read More

Hart Park Interpretive Playground

Hart Park Interpretive Playground

Hart Park Interpretive Playground Families of Wauwatosa and the surrounding Milwaukee suburbs are enjoying the  Interpretive playground, splashpad and bandshell at Hart Park. The theme of the playground and landscape elements at North 70th and West State Streets is pre-settlement Wauwatosa with tributes to the Menonomee River, Native Americans, and the Schoonmaker Reef. The ADA…

Read More

Peck Elementary School

Peck Elementary School GRAEF provided site/civil engineering services for an expansion at Peck Elementary School. A major design component for the addition focused on providing a LEED for Schools Silver rating with emphasis on innovative LEED/sustainable design concepts. The school expanded with a new three-story building addition and complete redevelopment of the 3.7-acre site. Site…

Read More

Martin Elementary

Martin Elementary School Martin Elementary School is part of the Green Bay Area Public School District. When the district wanted to add three new additions, totaling 21,000 square feet, to the existing Martin Elementary they called upon GRAEF to provide structural engineering services. The additions house a new gym, supporting spaces, classrooms, library, and restrooms.…

Read More

Francis Parker School

Francis Parker School Originally constructed in 1962, GRAEF has had the privilege to work with Francis W. Parker School throughout its history to provide structural design for several expansions and renovations. Located in Chicago’s Lincoln Park neighborhood, the school is home to grades JK through 12. Among challenges faced by engineers during projects at the…

Read More

Manitowoc Crane High Bay Heavy Assembly Addition

Manitowoc Crane High Bay Heavy Assembly Addition Manitowoc Crane Company expanded its Manitowoc facilities to meet demands for growth and capacity. GRAEF provided planning, architectural, structural, site/civil and MEP engineering services for the renovation and modernization projects which were completed in multiple phases. The Manitowoc campus expansion included numerous renovations and additions. A new 4,000-square-foot…

Read More

Komatsu Fabrication Building

Komatsu Fabrication Building Komatsu Mining Corp. is building a new fabrication building in Longview Texas. The 167,000-square-foot heavy manufacturing facility will produce the world’s largest wheel loader with an operating weight of 477,100 – 486,250 pounds. The facility includes two crane bays with two 50-ton gantry bays each. There are also several semi-gantry cranes under…

Read More

Gulfstream Park Pegasus

Gulfstream Park Pegasus Gulfstream Park is one of the premier venues for horse racing in the country with some of the world’s top thoroughbred contenders passing through here on their way to the Triple Crown. The Park also boasts a world-class casino, dining, and shopping. GRAEF was part of a team who designed the new…

Read More