Clearwater Harbor Marina Masterplan

Clearwater Harbor Marina Masterplan

GRAEF was selected to help design and oversee the construction work for Clearwater Harbor Marina’s Masterplan. GRAEF inspected the marina's current condition, focusing on the floating docks, and planned for both the next 5-10 years and the long term 15-25 years. The floating docks, installed in 2010, had undergone various repairs, especially after Hurricane Irma in 2017 caused damage.

GRAEF also recommended the best dock systems and construction methods for the marina’s needs, taking into account regulatory issues, costs, and construction schedules. The goal was to reduce future maintenance costs and damage from storms with better designs and materials. GRAEF also assisted during the construction to ensure everything went according to plan.

Other Projects

IMG_6415

Destin-Fort Walton Beach Airport BHS Expansion

MOY06412AJPG

Milwaukee Mitchell International Airport Concourse D Jet Bridges

IMG_1857

Destin-Fort Walton Beach Airport Ticketing Terminal Expansion

IMG_6135

Miami International Airport Building 3089 (Park 8) 40/50 Year Recertification

IMG_5297 Edited

Miami International Airport FedEx Cargo Distribution Center Expansion

Aerial

Austin-Bergstrom International Airport Baggage Handling System

Location

Clearwater, Florida

 

Services

Coastal Engineering

 

Clearwater Harbor Marina Masterplan Contact

Office Leader - Orlando, Sarasota, Turks and Caicos