Orlando International Airport Parking Garages Lighting Retrofit

GRAEF provided electrical engineering services for a lighting retrofit project for 7,000,000 square feet of parking garages including the terminal top and landscape areas between Garages A and B at Orlando International Airport.

Work included on-site analysis, data collection, field verification of existing electrical distribution and emergency lighting systems, and research. A main focus of this analysis was to provide the Authority with energy efficient alternatives. GRAEF provided a detailed report and presentation of findings to the Greater Orlando Aviation Authority which included fixture alternatives and recommendations.

GRAEF engineers then prepared construction documents based on the recommended solutions selected by the Authority. These documents included detailed bid plans and specifications as well as probable construction costs. GRAEF is also assisting the Authority in the permitting, bidding and contractor award, and construction administration for this project.

Other Projects

Aerial

Austin-Bergstrom International Airport Baggage Handling System

Milwaukee Mitchell International Airport Parking Structure

Milwaukee Mitchell International Airport Parking Structure

FLL T3 Header

Fort Lauderdale-Hollywood International Airport Terminal 3 BHS/CBIS

FLL T1 Header

Fort Lauderdale-Hollywood International Airport Terminal 1 BHS/CBIS

Southwest Cargo

Hartsfield-Jackson Atlanta International Airport Southwest Airlines Cargo Renovation

IMG_6135

Miami International Airport Building 3089 (Park 8) 40/50 Year Recertification

Location

Orlando, FL

 

GRAEF Services

Electrical Engineering

Orlando International Airport Parking Garages Lighting Retrofit Contact

Scott Hinrichs

Scott Hinrichs

Office Leader – Orlando, Sarasota, Turks & Caicos