New Berlin Recycling Center Cold Storage Buildings
The City of New Berlin was in need of relocating two prefabricated steel buildings at its recycling center site. GRAEF provided full services for the two approximately 22,000 square feet buildings.
Due to the relocation of the proposed buildings, additional geotechnical work was required in addition to survey, civil, and preparation of a stormwater management plan for the entire recycling center site as part of an overall master plan as provided by the City.
Other Projects
Location
New Berlin, WI
Data
22,000 SF
44,000 SF Total
GRAEF Services
Structural Engineering
Civil Engineering
Mechanical Engineering
Electrical Engineering
Plumbing Engineering
Industrial Architecture
Environmental
Survey
Stormwater Management
New Berlin Recycling Center Cold Storage Buildings Contact
Market Area Leader - Municipal