Franklin Sewer Header

Franklin Sewer & Water Building

GRAEF provided the City with architectural/engineering services related to design and construction of a new facility for the Franklin Sewer and Water Utility. GRAEF provided project management services, civil engineering; landscape architectural design; architectural design; structural engineering; mechanical, electrical, and plumbing engineering; fire protection design; and construction administration to remodel the existing Sewer and Water Utility Building and a 20,200-square-foot addition to the existing building.

GRAEF provided schematic design services to identify alternatives for stormwater management and to identify alternatives for green infrastructure initiatives. These green initiatives include a green roof, pervious paving, rain gardens, and daylighting.

Other Projects

05-DJI_0454

Northwestern Mutual Campus Connection & Tower

Landmark Credit Union_GRAEF

Landmark Credit Union

Milwaukee Tool Downtown_GRAEF

Milwaukee Tool Re-Adaptive Reuse

Aerial

Austin-Bergstrom International Airport Baggage Handling System

Southwest Cargo

Hartsfield-Jackson Atlanta International Airport Southwest Airlines Cargo Renovation

IMG_6135

Miami International Airport Building 3089 (Park 8) 40/50 Year Recertification

Franklin Sewer & Water Building Contact

Samantha Bakke

Samantha Bakke

Market Area Leader - Mechanical, Electrical, Plumbing

Leave a Comment

You must be logged in to post a comment.