Ambergris Cay

Ambergris Cay

Erickson Consulting Engineers (ECE), a GRAEF company, designed a phased approach for the development of the Ambergris Marina. Phase 1 was designed to restore the navigability of the entrance channel and “beautify” the marina by excavating the salt flats to provide circulation as well as provide a tidal connection between the marina basin and the entrance channel to promote flushing. Phase 2 called for the full scale development of the marina to create a fully functional and navigable marina for use by vessels up to 125 ft LOA. Dredged material was designed for land reclamation use to support a mix of development (residential, multi-family residential and commercial). Ultimately, ECE developed a plan which is sensitive to and blends with the islands physical, environmental and cultural heritage of the island.

 

Key Project Elements:

• Topogrpahic and Hydrographic Surveys
• Geotechnical Investigations (core borings and vibracores)
• Marine Biological Mapping
• Water Quality Testing & Analysis
• Marina Market Analysis
• Marina Planning and Feasibility Analysis
• Dredge and Land Reclamation Design
• Marina Layout and Slip Mix
• Environmental Assessment
• Engineer’s Estimate of Probable Construction Cost

Other Projects

OakPark CAP HeroImage

Climate Ready Oak Park Plan

Adventure Africa Hero Image

Milwaukee County Zoo Adventure Africa Hippo Haven

Village of Hales Corners DPW

Village of Hales Corners Department of Public Works Facility

Fincantieri Marinette Marine

Fincantieri Marinette Marine Plant Expansion

Signature Flight Support O’Hare Terminal

Signature Flight Support O’Hare Terminal

Dane County Airport

Dane County Regional Airport Multi-Phase Parking Expansion

Location

Turks and Caicos Islands

 

Services

Coastal Engineering

Environmental Engineering

Survey

Ambergris Cay Contact

Karyn Erickson

Karyn Erickson

Office Leader - Sarasota, Turks and Caicos

Leave a Comment

You must be logged in to post a comment.