CTH JJ_GRAEF

WisDOT County Highway JJ Manitowoc River Bridge Replacement

The project consisted of the bridge replacement and approach work on CTH JJ over the Manitowoc River to improve the overall safety by addressing structural deficiencies. Construction inspection of major items of work included the demolition and removal of the existing bridge structure B-36-19, construction of the new structure B-36-247 along with the reconstruction of the roadway approaches including grading, base course, concrete pavement, curb & gutter and surface drains, HMA pavement, beam guard, permanent signing, restoration, erosion control, pavement marking, traffic control along with all incidental items necessary to complete the work while maintaining a posted detour.

Construction was completed in 2022 and is part of a WisDOT Local Program.

Other Projects

Great Lakes Water Supply_GRAEF

Great Lakes Water Supply Program

Parkhaven at Pike Place

Parkhaven at Pike Place

Drexel Town Square Wetland Park

Drexel Town Square Wetland Park

Urban Ecology Ephemeral Pond

Urban Ecology Ephemeral Pond

Kinnickinnic River Pulaski Park_GRAEF

Kinnickinnic River – Pulaski Park

Openlands Header

Openlands Lakeshore Trail

Location

Town of Rockland, Manitowoc County

 

GRAEF Services

Rural Roadway Reconstruction/Rehabilitation

Bridge Reconstruction/Rehabilitation

CTH JJ Manitowoc River Bridge Replacement Contact

Practice Area Leader - Transportation