Wisconsin Center Expansion

The Wisconsin Center District's Baird Center Expansion 

The Baird Center is a convention and exhibition center located in downtown Milwaukee, Wisconsin. The center is part of a greater complex of buildings which includes the UW–Milwaukee Panther Arena and the Miller High Life Theatre, known as the Wisconsin Center District.

The Baird Center Expansion will bring the exposition hall to 300,000 contiguous square feet; add 24 new meeting rooms; include no fewer than 400 indoor parking spaces; add six loading docks; add an executive kitchen; and feature a spectacular fourth-floor ballroom with space for a minimum of 2,000 for a seated dinner.

Upon opening, the expanded Baird Center is projected to support 2,300 full-time equivalent jobs throughout the state of Wisconsin.

GRAEF is proud to provide structural engineering on this historic Wisconsin project.

The groundbreaking was held in October 2021, and is expected to open May 2024.

Other Projects

South Milwaukee High School Field Reno

South Milwaukee High School Field Redevelopment

Carl Sandberg Field

Carl Sandburg High School Baseball Field

Historic Third Ward Riverwalk

Historic Third Ward Riverwalk

Milwaukee Athletic Club

Milwaukee Athletic Club

Milwaukee Bucks Training Facility

Froedtert & the Medical College of Wisconsin Sports Science Center

Lake Monona Waterfront Design

City of Madison Lake Monona Waterfront

Location

Milwaukee, WI

 

Project Data

$456 Million Project Cost
300,000 Contiguous Square Feet

 

GRAEF Services

Structural Engineering
GRAEFaccelerāte®

Wisconsin Center Expansion  Contact

Market Area Leader - Sports & Recreation

Leave a Comment

You must be logged in to post a comment.