McCormick Place

McCormick Place Expansion

The McCormick Place expansion, featuring the new 2.5 million-square-foot McCormick Place West, opened in 2008. The facility includes 470,000 square feet of exhibition space, 250,000 square feet of meeting space, and a 100,000-square-foot ballroom, giving McCormick Place West more meeting space than any other facility of its kind.

GRAEF served as a subconsultant to A. Epstein and Sons, providing structural engineering services for the elevated truck apron and bridge to the existing hall. The 100,000-square-foot apron serves as the major access center for trucks setting up or tearing down shows. Semi-trailer trucks can access the facility through the apron and drive directly onto the exhibit hall floor or dock at one of 40 truck berths. GRAEF also engineered a bridge over Martin Luther King Drive to the McCormick Place South Building. The structure is designed to support numerous semi-trailer trucks simultaneously and resist the corrosive effects of harsh Midwest winters.

Other Projects

26-027_DJI_20250831173242_0141_D

City of Franklin Ballpark Commons Master Plan

02-DJI_0676

Lapham Lodge

Alliant Energy Center_GRAEF

Alliant Energy Center

Jackie Robinson Ball Park Expansion_GRAEF

Jackie Robinson Ball Park Expansion

American Family Field J. Leinenkugel's Barrel Yard

American Family Field J. Leinenkugel’s Barrel Yard

Renaissance by Marriott_GRAEF

Renaissance by Marriott

Location

Chicago, IL

 

Project Data

$850 Million Project Cost
2.5 Million Square-Foot Expansion

 

GRAEF Services

Structural Engineering

McCormick Place Expansion Contact

Mike Vogel

Mike Vogel

Chief Strategy Officer

Leave a Comment

You must be logged in to post a comment.