Amergris Cay

Ambergris Cay

GRAEF designed a phased approach for the development of the Ambergris Marina. Phase 1 was designed to restore the navigability of the entrance channel and “beautify” the marina by excavating the salt flats to provide circulation as well as provide a tidal connection between the marina basin and the entrance channel to promote flushing. Phase 2 called for the full-scale development of the marina to create a fully functional and navigable marina for use by vessels up to 125 ft LOA. Dredged material was designed for land reclamation use to support a mix of development (residential, multi-family residential, and commercial). Ultimately, GRAEF developed a plan that is sensitive to and blends with the island's physical, environmental, and cultural heritage of the island.

 

Key Project Elements:

• Topogrpahic and Hydrographic Surveys
• Geotechnical Investigations (core borings and vibracores)
• Marine Biological Mapping
• Water Quality Testing & Analysis
• Marina Market Analysis
• Marina Planning and Feasibility Analysis
• Dredge and Land Reclamation Design
• Marina Layout and Slip Mix
• Environmental Assessment
• Engineer’s Estimate of Probable Construction Cost

Other Projects

Center for Black Excellence_GRAEF_JLA

The Center for Black Excellence and Culture

Fiserv Forum_GRAEF

Milwaukee Bucks Fiserv Forum

Green Bay Country Club_GRAEF

Green Bay Country Club

Quad Graphics_GRAEF

Quad Graphics

National Railroad Museum_GRAEF

National Railroad Museum

City of West Bend_GRAEF (1)

City of West Bend Downtown Master Plan

Location

Turks and Caicos Islands

 

Services

Coastal Engineering

Environmental Engineering

Survey

Ambergris Cay Contact

Office Leader - Sarasota, Turks and Caicos

Leave a Comment

You must be logged in to post a comment.