Blue Cay

Blue Cay

Coastal Design and Engineering, a GRAEF company (CDE), was selected to design, permit and manage the construction for the coastal and marine infrastructure components of a 14.5-acre waterfront development. The project included an 870-foot-long and 85-foot-wide canal, a recreational beach stabilized by coastal structures, waterfront facilities and upland grading for 16 residential properties. The project also involved the design of dock structures along the canal at each property. The high-end residential development is focused around the canal and ocean waterfront, providing each lot with an individual dock for a unique, highly functional and visually appealing yacht-friendly community. Coastal/marine infrastructure includes a recreational beach, stabilized by groynes and piers with boardwalks and docks for boat access.

 

Key Project Elements:

• Waterfront Facilities (Boardwalks, Docks and Moorings)
• Dredging Design and Sediment Management
• Numerical Modeling for Flushing and Water Quality Analysis
• Dock Planning and Vessel Mooring Layout
• Sand Stabilizing Piers with Boardwalks and Docks
• Recreational Beach Design
• Storm Assessment to Establish Upland Development Elevations
• Upland Grading and Property Terrace Design
• Canal Entrance Perimeter Treatment
• Regulatory Permitting
• Estimation of Quantities, Costs and Construction Schedules
• Environmental Mapping and Impact Assessment

Construction Phase Services:
• Construction Plans and Specifications
• Construction Bidding and Contracting
• Construction Monitoring and Administration
• Leadership of Progress Meetings
• Environmental Monitoring
• Construction, Observation Inspection and Closeout

Other Projects

26-027_DJI_20250831173242_0141_D

City of Franklin Ballpark Commons Master Plan

IMG_6415

Destin-Fort Walton Beach Airport BHS Expansion

MOY06412AJPG

Milwaukee Mitchell International Airport Concourse D Jet Bridges

IMG_1857

Destin-Fort Walton Beach Airport Ticketing Terminal Expansion

IMG_6135

Miami International Airport Building 3089 (Park 8) 40/50 Year Recertification

IMG_5297 Edited

Miami International Airport FedEx Cargo Distribution Center Expansion

Location

Turks and Caicos Islands

 

Services

Coastal Engineering

Marine Engineering

Environmental Services

Blue Cay Contact

Office Leader - Orlando, Sarasota, Turks and Caicos