Skip to content
HPIM0354.JPG

Waterford Dam Embankment Repairs

GRAEF has been retained by Racine County to respond to items listed in the inspection letter from the Wisconsin Department of Natural Resources (WDNR). Specifically, GRAEF has prepared construction documents, including drawings and specifications for embankment repairs at both the west and east spillways of the Waterford dam.

In addition to the embankment repairs, which are slated for the spring of 2011, GRAEF is currently finalizing and Inspection, Operation, and Maintenance (IOM) plan, and Emergency Action Plan (EAP), and a dam failure analysis for the dam.

Other Projects

Fisher Island

Fisher Island Development

Openlands Header

Openlands Lakeshore Trail

Drexel Header

Drexel Town Square

Kaukauna Header

Kaukauna Hydro Park

Franklin Oakwood Header

Franklin W. Oakwood Road Improvements

Construction 90-Inch Hot Tap Header

Illinois 90-Inch Hot Tap along I-90

Location

Waterford, WI

 

Project Data

$250,000 Construction Cost

 

GRAEF Services

Plans and Specifications
Permitting
Inspection, Operation, and Maintenance Plan
Emergency Action Plan
Dam Failure Analysis
Structural Engineering
Site/ Civil Plans

Waterford Dam Embankment Repairs Contact

Schneider Brian Cropped

Brian Schneider

Practice Area Leader - Environmental