Skip to content
Franklin Oakwood Header

Franklin W. Oakwood Road Improvements

GRAEF provided the City with architectural/engineering services related to design and construction of a new facility for the Franklin Sewer and Water Utility. GRAEF provided project management services, civil engineering; landscape architectural design; architectural design; structural engineering; mechanical, electrical, and plumbing engineering; fire protection design; and construction administration to remodel the existing Sewer and Water Utility Building and a 20,200-square-foot addition to the existing building.

GRAEF provided schematic design services to identify alternatives for storm water management and to identify alternatives for green infrastructure initiatives. These green initiatives included a green roof, pervious paving, rain gardens, and daylighting.

Other Projects

VFW Aquatic Center_header

City of De Pere VFW Aquatic Center

Publix

Publix at Hollywood Beach

BCEC_01

Brown County Expo Center Redevelopment

Fisher Island

Fisher Island Development

AuroraBayAreaMedicalCenter-01

Aurora Bay Area Medical Center

UWGB Kress Header

University of Wisconsin-Green Bay Kress Center

Franklin W. Oakwood Road Improvements Contact

Paulos_MIke 2012New Background

Mike Paulos

Principal - Milwaukee

Leave a Comment

You must be logged in to post a comment.